For prime contractors
Price analysis that survives the review
Your purchasing file has to show you analyzed the subcontractor’s price before you awarded it, against FAR 15.408 Table 15-2 and the DFARS 252.215-7009 checklist. A former DCAA Supervisory Auditor does that analysis, and documents it the way the reviewer expects to see it.
- Former DCAA Supervisory Auditor
- FAR 15.408 Table 15-2
- DFARS 252.215-7009
- FAR 15.404-1 techniques
- Task by task, no retainer

The chain is short and it is not discretionary.
FAR 15.404-3(c) requires you to obtain and analyze certified cost or pricing data before you award a subcontract, purchase order or modification above the threshold. Not at negotiation, not at closeout. Before award. And you submit that data to the Government when the subcontract is $20 million or more, or exceeds both the certified cost or pricing data threshold and 10 percent of your own proposed price, unless the contracting officer says otherwise.
FAR 15.404-3(b) then requires that the analysis actually establish reasonableness, and that the results go into your own price proposal. Your conclusion becomes part of what the Government relies on.
The supplier’s submission is measured against FAR 15.408, Table 15-2, which is the instruction set for a proposal requiring certified cost or pricing data. DFARS 252.215-7009 supplies the adequacy checklist. The analytical techniques come from FAR 15.404-1, and the file has to say why the one you used fits the circumstances.
Separately, if your government sales are expected to exceed $50 million over the next twelve months, DFARS 244.302 puts your purchasing system in line for a Contractor Purchasing System Review. The civilian threshold under FAR 44.302 is $25 million. That review reads these files.
Inadequate price analysis is one of the findings reviewers write most often, and it is rarely because nobody knew the rule. It is because the proposals arrived in a cluster, the analyst position was open, and the file got closed on a quote comparison that will not hold up.
Who this is for
Primes buying from subcontractors
This page is written for the people who own subcontract pricing inside a prime: supply chain compliance, subcontracts administration, procurement compliance, and the finance leads who get pulled in when a purchasing system review is coming.
More proposals than analysts
Supplier proposals arrive in clusters and the analyst seat is open or already committed. Interim support costs less than a hire you will not need in six months.
A CPSR ahead or behind you
Preparing for one, or remediating findings after one. Either way the files have to show the analysis, not just the conclusion.
First certified data subcontract
A subcontract crossing the certified cost or pricing data threshold for the first time, where nobody in the building has run this analysis before.
In practice that means contractors large enough to carry the obligation and not large enough to keep a standing pricing organization. If your government sales are heading past $50 million under DFARS 244.302, or $25 million on the civilian side under FAR 44.302, you are in scope whether or not anyone has told you yet.
Not the right page if you are a small business that needs bookkeeping, a business tax return or DCAA accounting system readiness of your own. That work is real and I do it, it is just a different problem: see the published prices or start on the home page.
What gets tested
The questions a reviewer actually asks
I spent twelve years at the Defense Contract Audit Agency, finishing as a Supervisory Auditor, deciding whether contractors’ records supported their costs. The questions are consistent.
Was the submission complete?
Did the supplier proposal meet the Table 15-2 instructions under FAR 15.408, and the Proposal Adequacy Checklist at DFARS 252.215-7009? Was the deficiency documented and chased?
Was the right technique used?
FAR 15.404-1 does not let you pick one at random. The analysis has to fit the circumstances, and the file has to say why that technique was appropriate here.
Does the conclusion trace to evidence?
Every recommended position needs to reconcile to the proposal it analyzed, with calculations a third party can reproduce from the workpapers.
The standard
What the purchasing file has to contain
A reviewer is not reading your conclusion. They are reading whether the file supports it. A statement that the supplier’s price was accepted, with no analytical basis written down, does not meet FAR 15.404-3(b), however reasonable the price actually was.
| In the file | Why it has to be there |
|---|---|
| The supplier’s complete proposal, with cost element detail and supporting schedules | It is the thing being analyzed. A summary page is not a proposal |
| Solicitation, statement of work, specifications, amendments and the supplier’s stated assumptions | Establishes the scope and the pricing baseline the analysis runs against |
| Evidence of competition: what was solicited, what came back, the technical evaluation, why this source | Competition is itself a recognized price analysis technique under FAR 15.404-1 |
| A written price analysis memorandum naming techniques used, data considered, adjustments made and the conclusion | This is the document whose absence is the finding |
| The certified or other than certified data obtained, with the date received and every update | Data must be current, accurate and complete as of the date of price agreement |
| Cost element analysis where price analysis alone will not carry the conclusion | Required when certified cost or pricing data are in play |
| The negotiation record and the award rationale | Shows the conclusion was reached before award, not reconstructed after it |
Two provisions sit behind the review itself. FAR 44.303 sets what a Contractor Purchasing System Review examines, and the degree to which you analyze subcontract prices is explicitly part of it. FAR 44.202-2 governs consent to subcontract, where a contracting officer weighs whether your analysis supports the price before consenting.
On the DFARS checklist, one distinction worth keeping straight. DFARS 252.215-7009 is a proposal submission checklist directed at the offeror. Primes routinely flow it to suppliers as a completeness tool, which is useful and which I will apply, but it does not substitute for your own independent analysis or for the documentation above. If a file contains a completed checklist and nothing else, it is not finished.
The work
What I do
Independent subcontract cost and price analysis, supporting your responsibilities under FAR 15.404-3(b) using the techniques at FAR 15.404-1. The analysis and the recommendation are mine. The procurement decision, the acceptance of the conclusion and the adequacy of the file remain yours.
Adequacy assessment
The supplier submission tested against the applicable Table 15-2 instructions and the DFARS checklist, line by line, with supporting locations recorded, a deficiency log, and one consolidated data request rather than five rounds of email.
Then the cost elements, tailored to the scope and complexity of what you have authorized:
| Element | What the analysis covers |
|---|---|
| Direct labor | Hours, labor mix, time phasing, bases of estimate, historical productivity, proposed rates |
| Material and subcontracts | Bills of material, quantities, quotes, purchase history, scrap and yield, lower-tier analyses, interorganizational transfers |
| Indirect rates | Rate application, allocation bases, escalation, forward pricing agreements, variance against history |
| Other direct costs | Travel, freight, tooling, equipment, and duplication against the indirect pools |
| Profit and total price | The proposed fee rationale and the overall price, with comparisons where they are useful and their limits stated |
| Changes | Additions, deletions, credits and changed quantities measured against the relevant baseline |
Potential unallowable, unallocable or unreasonable amounts are identified with the factual and regulatory basis, under FAR Part 31. Arithmetic corrections, unsupported costs and recommended negotiation positions are kept separate, because they are three different things and an unsupported amount is not automatically a disallowed one.
You receive the adequacy assessment, a cost analysis report, and native Excel workpapers with working formulas and traceable source references. Editable, not locked PDFs, because your file has to stand on its own after I am gone.
What you receive
Deliverables, and what finished means
| Deliverable | Form |
|---|---|
| Task plan agreed before any billable work | Scope, staffing, data needed, milestones, estimated effort |
| Adequacy assessment | Completed checklist crosswalk, supporting locations, deficiency log, one consolidated data request. Editable Word and Excel |
| Cost analysis report | Conclusion up front, then method, sources, analysis by element, proposed against recommended, risks and limitations |
| Supporting workpapers | Native Excel with live formulas and traceable source references, not a locked PDF |
| Final report and disposition log | Your comments resolved, unresolved issues named rather than buried, preparer and reviewer identified |
Finished means something specific. Every deliverable reconciles to the exact proposal version it analyzed. Calculations reproduce without me in the room. Material conclusions link to evidence. Proposed, questioned and recommended amounts are kept separate, because they are three different things. And where the data was incomplete, the report says so rather than quietly working around it.
Errors and omissions inside the agreed scope get corrected without further charge. That is not a concession, it is what the standard should be.
Review
Someone independent signs it before you see it
Every report and workpaper package is reviewed by a second former DCAA professional whose career was spent managing audit quality inside the agency, more than thirty years of it across auditor, supervisory auditor, branch manager and quality manager roles.
That matters because your purchasing file is the thing being examined, not mine. A conclusion that has already survived an independent challenge is worth considerably more than one that has not, and a sole practitioner who reviews his own work is offering you a signature rather than a control.
Where preparer and reviewer need to be documented separately in your file, they are.
Handling your data
Proprietary supplier pricing
Confidentiality agreements executed before any protected information changes hands, with storage and processing locations identified rather than assumed. Nothing is uploaded to public AI services or to any system you have not approved. Subcontractors, if any are proposed, are named and approved by you before they see anything.
You receive rights to retain, reproduce and use the reports and workpapers for your procurement, your negotiations and any authorized customer or Government review. The file is yours, which is the only arrangement that makes sense when it is your purchasing system being examined.
Who does it
The person who used to write the findings
Twelve years at DCAA, finishing as a Supervisory Auditor. Then two years inside a defense technology company building its compliance program, and now my own CPA firm serving federal contractors.
That matters here for one reason. Most people who can do this analysis learned it from the contractor side, where the goal is to get the price approved. I learned it from the side that decides whether the file holds, which is the side your reviewer will be sitting on.
You get me doing the work. Not a junior analyst learning on your proposal while someone senior bills to review it.
Commercial terms
How engagements work
Work is authorized task by task in writing. No retainer, no minimum volume, no exclusivity, and nothing billable starts before you have authorized it.
Billed in quarter-hour increments against actual time, with an eight-hour minimum per task. The adequacy assessment can be taken as a fixed fee instead, so that piece carries no hourly risk at all.
Not billed: correction of errors within the agreed scope, one round of comment resolution, the weekly status summary, and travel time. Travel and expenses at cost with prior written approval only, and no separate charge for research subscriptions or software.
Rates are quoted per engagement and held for twelve months. Tell me the procurement context and the proposal value and you will have them the same day.
Straight answers
Questions worth asking
Is this an audit opinion?
No. This is analysis and a recommendation to support your pricing responsibilities. It is not a Government audit, and the supplier’s certification of cost or pricing data stays with the supplier’s authorized representative, where it belongs.
We have an analyst, we just have too many proposals at once.
That is the usual reason people call. Interim and on-call support exists for exactly that, and it is cheaper than a hire you will not need in six months.
What if the supplier data is incomplete?
Then I say so, in writing, before the hours are spent. You get a consolidated data request and a view on whether the analysis can proceed with documented limitations or should wait. Silently absorbing a delay and billing through it helps nobody.
How do you handle proprietary supplier pricing?
Under a confidentiality agreement executed before any protected data is released, with storage and processing locations identified. Nothing is uploaded to public AI services or to any system you have not approved.